top of page
The Basics Of Channel Letter Signs
PRODUCTION TIME
Approximately between 6-7 months after final approval and all signatures provided.
CITY PERMIT
A city permit is required for all channel letter signs. Fees may vary.
ELECTRICITY
Customer is responsible for providing power within 10ft from sign.
bottom of page